Patel Jignesh

18 yrs of experience in Oil and Gas Industries as A PMC supervisor

India | Oil / Gas / Petroleum

Connect
Profile
searching a challenging carrier as I have 18+ years of experience in EPC projects, Oil & Gas and Petrochemical industry as a Field and DCS control panel operation. Offshore and Onshore projects I have good knowledge of pre-commissioning, commissioning, plant normal start-up and shutdown activities.etc Compressor operation ELLIOTT EBARA GROUP -JAPAN CENTRIFUGAL COMPRESSOR capacity 5183M3/hr, Power-1339KW for gas plant fuel gas, and KOBELKO (KOBE STEEL LTD) double stage double acting reciprocating compressor 1st stage 27398 kg/hr 2nd stage 25855kg/hr with 72 barg discharge pressure power 3500KW Off Gas Compressor for condensate stabilization unit. Air Pack, Netherland Make 4 stage reciprocating diesel driven compressor which Capisity 300 NM3/HR and Discharge pressure 43 kg/cm2 Successfully Commissioned in O.N.G.C WO-15 and WO-16 Cluster and well head plate form. With Dryer unit which dew point gains -37 oC. Also, MRT Chemical injection pumps, Condensate Transfer pumps, Diesel Transfer pumps and Chemical transfer pumps. Which all pumps work with pneumatic pressure.

View Patel’s full profile. It's free!

1 million+ other people are on Universalhunt. Search and connect with the potential people across countries. Invite them to your network, send messages and share opportunities.


View Patel’s full profile

Contact Details

Send connection reqest to view contact details of Patel Jignesh.

People You May Know

Tariro John Kamutsungira

GIS Technician at Abbeydale Building & Civils

Altamash Hamayon

Senior Manager at Unemployed

Selvakrishna R.B

Mechanical engineering at GCCM

Chandrasekar V

System Design Engineer at ACCUBOT Automation Pvt Ltd

Vishwajit Saha

Regional Manager at Unitrans Infotech Services
View All