Profile
i started my professional career as technician in the auxiliary department at ALSTOM, at this time, involved in development and construction of new skids. i work quickly, efficiently, independently and thoroughly. During that time period (2002-2005)
Alstom Power Switzerland
May 2001 – May 2003 (2 years 1 month)
- Gas turbine auxiliary blocks planning (PDMS)
- Correspondence with suppliers of gas turbine auxiliary components and equipment
- Creating Field service instructions for solving particular site problems
- Deal with air inlet cooling projects
- Successfully solved generic problem on particular component within GT air intake system
- Deal with installation of measurement instrumentation for various air flow measurements
- Creating specifications of gas turbine auxiliary components; pumps valves, filters, orifices
- One week of erection experience of the fogging system including evaluation of the system at site Castejon, Spain
Design Engineer