Profile
• My role of the project as Commissioning Engineer Planned and execute the project successfully completed with on time safety Manner.
• Preparation for Pre-Commissioning/Commissioning Activities like procedure making/Documentation/ Operating Philosophy/Standard Operating Procedure/ Plant start-up/Shut down sequences & Preparation, Operation & Maintenance Manual, Commissioning Procedure/Report and Training Manual/Report.
• Participate in role of Control Room In-charge (Yokogowa/Emerson/Invensys/Siemens PCS7 System)..
• Co-ordinate with my commissioning Supervisor/DCS supervisor/Field Supervisor.
• Involving commissioned process Unit like, Natural gas compression and Desulpurization section, Reforming Section, Methanol synthesis Section, Distillation Section, Catalytic Cracking Reformer and Naphtha Isomerisation, Crude oil Main Gathering Center.
• Involving commissioned utility unit like, Sew water Intake, Desalination, Mixed Bed Unit, Electro Chlorinator, Cryogenic Nitrogen Unit, Tank farm, Methanol jetty.