Profile
Wide range international experience and balance of engineering expertise with over 19 years, solid background of Static Equipment & Piping Engineering and Inspection in the Oil & Gas contracting industry, covering all aspects of Inspection activities, principles and practices gained from working in Shutdown/Turnaround & Expansion projects of petro -chemical Oil and Gas Industry. Has Experience in In-service inspection to detailed equipment and Piping assessment for Oil & Gas facilities. Experience with project execution and tender documentation(TBE), Vendor inspection, pre-commissioning and commissioning includes within operating plant environment turnaround management.
Quality Assurance and Control Mechanisms as well as improve Safety, Integrity and Reliability by Proactive Surveillance, Inspection and Audits for Operation & Maintenance, Shutdown or Construction Projects as per Mandatory Documents, Client Specifications, Governing Codes, Reference Drawings and co-ordination with internal departments.
SHUT-DOWN/TURNAROUND
1. VMP & QYI two major turnaround in Reliance Industries Limited, Gujarat, India.
2. Debottleneck Project for Yanpet, Yanbu (KSA) with ABBLYMMUS (TPI & Consultants).
3. Turnaround in Binh Son Refinery and Petrochemical Company Limited – Vietnam
4. Shutdown in EQUATE Petrochemical Company - Kuwait
OIL& GAS - REFINERY PROJECT & COMMISSIONING
World tallest Crude Column for ESSAR OIL with ABB Consultant.
DISTILLATION PLANT
1. DFA Project for Hindustan Lever Limited, Pondicherry with TATA Consultant
OIL TERMINAL PROJECT
1. LNG – Terminal Project for Gujarat State Petronet Ltd., Dahej, India.
2. FAL Project in Dubai (U.A.E) - Mott Macdonald Consultant
3. Shell Oil Terminal Project in Pulau laut (Indonesia) - Mott Macdonald Consultant
Cross Country of AFS Pipeline (Project cost of Rs 31Crore)
1. For BPCL Cochin from BVIL as a Project consultant & TPIA