Profile
OBJECTIVE
Seeking a Management position in Projects, Maintenance, Reliability, Capital Sustaining and Quality Assurance.
EXPERIENCE
Team Lead,
CNRL, Horizon Oil Sands, Fort McKay, Alberta, Canada. 2013-2015
Established, mentored, managed and drove my team. Delegated and distributed the workload to align with wider financial business objectives. Ensured the budgetary, revenue and scheduling targets were met for the organization with safety and environmental compliance. Integrated with engineering, operations and supply chain management. Provided guidance, presentations and lectures on the application of industry codes and Standards. Resolved day-to-day issues and conflict of interests. Audited internally, externally and vendor’s quality surveillances by arranging the Pre Inspection and Kick Off meetings. Prepared and reviewed the long term Businesses, Projects and Quality Plans. Participated in the research and development by using the lessons learned. Helped the SME Subject Matter Experts for knowledge and Government Matters.
Team Lead.
Ledcor Industries, Encana Gas Project, Fort Nelson, BC. 2012-2013
Managed, mentored, trained, and guided a team of inspectors for the QA / QC of the Mechanical, Electrical, Civil, Structural, Piping, GHT and insulation works according to the Client Specifications, Regulations, Codes and Standards. Prepared NCRs, CSRs, CARs, QSRs, RFIs, FTRs and daily HSE reports for the tool meetings. Reviewed EDC Engineering Design Change, IFC and Red Line drawings. Used my expertise in the problem solving and leadership skills for the project supervision, purchasing, engineering, operations and maintenance. Maintained a database for the QA / QC logs of the NDE and inspections. Verified QVDs Quality Verification Documents and final Turn Over documents.
Boilers, Pressure Vessels, Pressure and Process Piping.
Technical Standard Safety Authority, Sarnia, ON, Canada. 2007 - 2012
Experience in the Power, Petro-chemical, Oil & Gas refineries. Monitored audits for internal/external of the Boilers, Pressure Vessels, Pressure Piping, Process Piping, Safety Valves, Tanks, Columns, Heat Exchangers according to the Act, Regulations, CSA, NBIC, ASME, API, ABSA, TSSA, NFPA, SSCP, ISO Codes and Directives.
Managed, inspected, audited the installations, periodic, new construction, repairs, alterations, testing, review, approval of the new designs and registrations, incident investigations reports, NDE (PT, MT, UT, X-Ray, VT). Audited the ITPs, QA manuals, NCRs, procedures, techniques, drawings, PQR, WPS and WPQ in the Chemical Valley of Sarnia.
Supported ASME, NBBI Workshops, maintenance organizations and contractors. Reviewed reports from service companies on the safety valve services. Checked the compliance of Relief Valve Program and report deviations. Managed and participated in the investigation, follow-up of significant static equipment incidents and root cause analysis. Achieved the company revenue targets.
Managing Partner.
PTS & Power Kessels Pvt Ltd .Pakistan. 1992 -2005
Hired, supervised, coached and professionally developed the staff. Strong planning, communication delivered for overall value to the integrity management function. Managed the Co-generation Steam Boilers, Pressure Vessels, Pressure and Process piping for the EPCM. Investigated mechanical failure of unexpected maintenance problems.
Managed and prepared the contract documents ensuring budgetary and scheduling targets are met. Evaluated tenders for industrial construction and maintenance. Managed the engineers, technologists and technicians for the Mechanical construction, Erection, Fabrication, Modification, Commissioning of the Water and Fire Tube Steam Boilers with allied equipment, Pumps, Compressors, Water treatment plants, Condensing and Back Pressure Steam Turbines with generators. Used proper Welding Procedures for the welding. Projects of more than 130 million amount were completed.
ASSISIANT ENGINEER Sui Northern Gas Pipelines Ltd. Pakistan. 1988 - 1992
Assisted the Chief Engineer for high-pressure pipeline construction and fabrication works of 24”, 18”, 16” diameter, which included ROW, Stone Blasting, Trenching, Welding, ND examining, Air pressure testing, Coat and Wrap, Hydrostatic testing, Pig testing, Commissioning and Handing over to the Operation. Managed the Construction, Erection, Fabrication, Operation and Maintenance works of the high rise building for the HVAC, Co-generation system including Gas Turbines, Waste Heat Recovery Boilers and Absorption Chillers.
TRAINEE ENGINEER
Heavy Mechanical Complex. Pakistan. 1985 - 1988 Received training in different shops such as Fabrication shop, Machine shop, Non Ferrous shop, Forge shop, Production Planning Control Department and Design Department. Regarding the technical assistance required for the University Project of the Boiler design and fabrication according to ASME sec VIII div 1 and sec IX. Served in the Utilities section of the Plant for HVAC system, Compression chillers, Cooling towers, Air compressors, Water pumps, Ducting and Fans, Fire tube boilers, Reverse Osmosis Water Treatment Plant. This training was for the operations, maintenance, planning and scheduling