Ahmed Farag Mohamed Saber

Leader Infrastructure Engineer at Arab Engineering bureau

Qatar | Engineering / Infrastructure / Construction / EPC

Connect
Profile
Ahmed Farag Mohamed Saber
58- Al Medina St. – Kafer El Zayat
Gharbia – Egypt
Mob: +974-74754781 (Qatar)
Tel: +2-0402548921 (Egypt)
E. Mail: Ahmed_Farag_2003@Yahoo.Com
Ahmed_Farag_2003@Hotmail.Com
Career Objective
Obtain a position within the infrastructure engineering field where my experience as project manager will make a positive contribution to a company’s goal.
Career Achievements
More than 13 years of experience in engineering as infrastructure project Engineer the following duties and responsibilities:-
• Significant proficiency in the design of gravity and pressure mains covering potable water, foul water, irrigation/fire and storm water trunk mains and distribution systems including pump stations and water and wastewater treatment plants.
• Strong working experience of hydraulic design software , WaterCAD , WaterGems , SewerCAD , SewerGems and StormCAD
• Significant experience in wet utilities planning and design activities throughout the master plan, concept, preliminary and final design stages inclusive of potable water, sanitary, Strom ,irrigation, telephone and electrical networks.
• Manage projects from inception to completion whilst interfacing and coordinating with other infrastructure discipline engineers and building engineering services engineers.
• Understanding regional roads & utility design criteria and ability to effectively liaise with relevant statutory authorities and stakeholders at various stages of design to ensure compliance of the design with the prevalent regulations.
• Coordinating all the utilities work such as storm drainage, foul sewerage, water supply, street lighting, electrical, communication, etc. with all engineering disciplines in the office and with clients and resolve engineering issues during design development, review and check processes.
• Prepare of Preliminary and Conceptual design, detailed design, issued for construction design ,construction documents, specifications, cost estimation, method of measurement, catalogue cuts as well as support during construction ,etc,.
• Prepare technical reports, tender documents, bill of quantities; evaluate technical bids & reviews vendor/third party documents.
• Experience of design and tender process required including full comprehension of regional design codes, specifications, contractual terms and conditions along with assistance in preparation of bids and pre-qualification materials.
• The ability in the supervision and management of a team with regard to all aspects of utilities; concept, preliminary and final design stages.
• Responsible for quality control and maintaining quality standards in all works produced by the section, checking computations and/or reviewing design and drawings performed by others.
• Knowledge of regional design codes and specification including storm drainage design, pavement design, signage, road markings, utility ROW and protection works.
• Leads the Infrastructure Design projects teams to develop design solutions in a timely and cost-effective manner whilst complying with the requirements of the stakeholders.
• Attends the project related Meetings/Workshops/Presentations before the Clients / Developers/Government Agencies, as and when required.
• Confers with GM- Pre Contract Services and Contracts & Planning of the Company regularly for honoring the schedule of deliverable submissions.
• Assists the Senior Management to respond to RFP (Requests for Proposal) from the Clients as and when required.
• Prepares a detailed list of project deliverables and requirement of resources at Consultancy Services Proposal/Tender Stage and upon award of the projects.
• Monitors Sub-ordinates’ work output in terms of quality standards and timeliness of delivery and takes adequate measures to rectify any sub-standard outputs.
• Responds to RFI (Requests for Information) from the contractors at construction tender stage.
• Examines and approves/disapproves the material samples and other submittals with respect to the standard specifications before presenting it to the Client.
• Conversant with all national, Saudi (royal commission & Armco), Qatar (Ashghal & QCS) and international Codes and standards.
Career summary
July 20, 2013 – Today
Arab Engineering Bureau – Qatar (Doha)
Infrastructure design engineer
• Perform design/ hydraulic calculations related to wet utilities such as foul water, storm drainage, and pump /lift stations, potable water, fire, irrigation and storage tanks with pump rooms using governing engineering formulas, skills, and experience.
• Prepare the hydraulic models using Bentley software’s (WaterCAD, WaterGems, SewerCAD , SewerGems and StormCAD).
• Manage the projects from inception to completion whilst interfacing and coordinating with other discipline engineers.
• Coordinate all the utilities work such as storm drainage, foul sewerage, water supply, street lighting, electrical, communication, etc. with all engineering disciplines in house and with contractors to resolve engineering issues during design development, review and check processes.
• Preparation of concept, preliminary and detailed designs together with Tender and Contract documents for all wet infrastructure utilities including (storm drainage - water supply - foul water - fire -irrigation-roads).
• Detailed design for underground structures from Conceptual phase through Final approval.
• Prepares a detailed list of project deliverables and requirement of resources at Consultancy Services Proposal/Tender Stage and upon award of the projects.
• Provide engineering inputs and solutions during all phases of design development and project implementation
• Attends the project related Meetings, Workshops and Presentations before the Clients, developers and Government Agencies as and when required.
• Assists the Senior Management to respond to RFP (Requests for Proposal) from the Clients as and when required.
• Responds to RFI (Requests for Information) from the contractors through the construction stage.
• Coordinating with various Ministry and Municipal authorities for relevant approvals in coordination with design team.
Projects involved
 Internal security force (ISF) camp- LEKHWEYA.
 Barwa village expansion development (WAKRA) - BARWA.
 Tram System Integration - Msheireb Downtown Doha (MDD).
 Madinat Mawater – BARWA.
 Foul and storm water for Sheikh Suhaim block - Msheireb Downtown Doha (MDD).


March 28, 2011 –June30, 2013
Radicon-Gulf Consult – Saudi Arabia (al-Khobar)
Civil Engineer / Project Engineer
• preparation of site development and infrastructure works including (grading - storm drainage systems – potable water supply –industrial water supply - industrial drainage -sanitary drainage- firefighting-irrigation-roads-wastewater treatment plant- pump stations, etc).
• Preparation of Shop Drawings for the IFC site work which include all details needed for the proper construction considering all the data available for ( site developments , Fence , site paving , traffic signage , storm water system with channel details , foul water system , potable water network , fire water and all the service structures )
• Prepare the hydraulic models using Bentley software’s (WaterCAD, WaterGems, SewerCAD , SewerGems and StormCAD).
• Coordinate the design of the roads and site grading and preparation of the bill of quantities, cost estimates and technical specifications.
• Responsible for Coordinate all the wet and dry utilities such as storm drainage, foul water, potable water supply, street lighting, electrical, communication, etc. with all engineering disciplines in the office and with clients.
• Design the underground structures from Conceptual phase up to Final approval (sewage lift / pump station, potable water tanks and pump rooms).
• Perform design/ hydraulic calculations related to wet utilities such as irrigation, storm water and subsurface drainage networks using governing engineering formulas, skills, and experience.
• Manage the projects from conception up to completion whilst interfacing and coordinating with other disciplines engineers.
• Attends the project related Meetings/Workshops/Presentations before the Clients / Developers/Government Agencies, as and when required.
• Responds to RFI (Requests for Information) from the contractors through construction stage.
• Prepares a detailed list of project deliverables and requirement of resources at Consultancy Services Proposal/Tender Stage and upon award of the projects.
• Provide engineering inputs and solutions during all phases of design development and project implementation
Projects involved
 King Fahd cardiac centre & ICU centre for king Saudi university.
 Distribution centre & other facilities (Modern Industries Company (MIC).
 Yanbu export refinery project (YERP).
 Detailed design services for air separation plant project at Qurrayah (civil works), Air Liquid Engineering Middle East.
 RAS AL-KHAIR INDUSTRIAL CITY (RIC) feed services (RC, contract No.027-T01), Atkins association
 Multi-storey parking building (Saudi Electricity Company).
 Detailed engineering design for residential and services compound (RC, contact No. 082 – C01).
 Provision of inlet works at IWTP- 8 for Jubail- 2 industrial waste water.
 Gulf packaging industries new expansion project at Jubail-2.
 Engineering and design services for ROC project – Rabigh, Sankyu INC.
 Detail design and engineering services for R-PTC project - Rabigh, Sankyu INC.
 Production line building for line-4 plant at petro Rabigh, Saudi German Company .
 Preparation of EPC of Mardumah 115/13.8kv substation 20bd - RC contract no. 068-T09 (task-15), RGCK association.
 Preparation of EPC Bid Package for Contract No. 071- C020 115/13.8kV Substation at Jubail Commercial Port (JCP), RGCK association .
 EPC of expansion (KSIP) port substation 15BC task-16 contract No. 071- C16, RGCK associatio
 Technical study for transfer the 3-way sewage treatment water for irrigation at Dammam area - Dammam municipality.
 E/D for extension of existing workshop/office for Baker Hughes in Dhahran, Arcon.
 Walek Kiln Eaf (Electric arc furnace) dust recycling plant - Al-Manar Arabian Corporation.
February 15, 2010 –February 15, 2011
Abdullah A.Al-Suwailem & Partner – Saudi Arabia (Dammam)
Civil Engineer - General directorate of water in the eastern province ministry of water and electricity (Saudi Arabia-Dammam)

• Construction supervision for the foul water network with diameters starting from 300 mm to 1600 mm.
• Construction supervision for forcemain lines for 700 mm diameter and 3.5 km long from secondary lift station to main lift station.
• Construction supervision for two forcemain lines with 1200 mm diameter each have a length of 11 km.
• Construction supervision for main lift station including wet well, dry well, generator room, fuel tank room and boundary wall.
• Ensure that the execution of the work and the quality is in accordance with the contract by witnessing various tests like soil or rock samples at various depths during structural fill, testing samples to determine the compressive strength, test to determine the safe loading of soil.
• Plan, manage and monitor review of material submittals, construction method statements, shop drawings, material quality standards correspondence and RFI’s to all contractors, reviewing weekly and monthly progress reports.
• Communicate with the Contractors in all matters related to the quality of the executed work like concrete compressive tests, soil maximum dry density tests, plate load bearing test.
• Chairing the weekly technical meetings with the Contractor and resolving the issues in coordination with the design team to avoid any delays
• Manage the projects from conception up to completion whilst interfacing and coordinating with other disciplines engineers.
• Ensure that the Contractors are working with safety and to an approved method statement program and ensure that the Contractor takes adequate action towards possible shortcomings in their planning.
• Monitor changes to scope of design and construction, assessing the effects on time and cost.
• Attends the project related Meetings/Workshops/Presentations before the Clients / Developers/Government Agencies, as and when required.
Projects involved
 Sewage networks and pumping stations for the west of Dammam schemes - the first phase (project value 146000000 SR.).
 Implementation of marine surplus lines and pumping stations for the proposed treatment plants in Dammam and Khobar (project value 145 500 000 S.R).
December 22, 2008- February 10, 2010
Zuhair Fayez Partnership Consultant – Saudi Arabia (Dammam)
Civil Engineer - Municipality of Dammam – Development and project directorate (Saudi Arabia)

• Study of strategy to reduce subsurface water level and storm water drainage.
• Check all problems of existing storm water drainage networks and study to solving it.
• Design of storm drainage pump station and force mains for several districts inside Dammam city.
• Prepare the hydraulic models using Bentley software’s (SewerCAD, SewerGems and StormCAD) to check the existing water network.
• Preparation of the execution documents of the storm water drainage networks and pumping stations for the developed districts in Dammam and Khobar.
• Prepare the storm water management system and manage/supervise a team of designers and CAD operators in the accomplishment of the detailed engineering plans including storm water, force main and pump stations.
• Attends the project related Meetings/Workshops/Presentations before the Clients / Developers/Government Agencies, as and when required.
• Ensure that the Contractors are working with safety and to an approved method statement program and ensure that the Contractor takes adequate action towards possible shortcomings in their planning.
• Leads the Infrastructure Design projects teams to develop design solutions in a timely and cost-effective manner whilst complying with the requirements of the stakeholders.
• Perform design/ hydraulic calculations related to wet utilities such as irrigation, storm water and subsurface drainage networks using governing engineering formulas, skills, and experience.
Projects involved
 Study of strategy to reduce subsurface water level and storm water drainage at the eastern province cities (project value 3000000 SR.).
August 1, 2006 –December 15, 2008
Egyptian Co. for Eng. Consulting Services (Misr Consult) – EGYPT -Cairo
Environmental and Civil Engineer
• Utilities planning and design activities throughout the master plan, concept, preliminary and final design stages inclusive of potable water, sanitary, Strom, irrigation, telephone and electrical networks.
• Prepare the hydraulic models using Bentley software’s (WaterCAD, WaterGems, SewerCAD , SewerGems and StormCAD).
• Design the underground structures from Conceptual phase up to Final approval (sewage lift / pump station, potable water tanks and pump rooms).
• Perform design/ hydraulic calculations related to wet utilities such as irrigation, storm water and subsurface drainage networks using governing engineering formulas, skills, and experience.
• Manage the projects from conception up to completion whilst interfacing and coordinating with other disciplines engineers.
• Attends the project related Meetings/Workshops/Presentations before the Clients / Developers/Government Agencies, as and when required.
• Design of gravity and pressure mains covering potable water, foul water, irrigation/fire and storm water trunk mains and distribution systems including pump stations and water and wastewater treatment plants.
• Coordinate all the utilities work such as storm drainage, foul sewerage, water supply, street lighting, electrical, communication, etc. with all engineering disciplines in house and with contractors to resolve engineering issues during design development, review and check processes.
• Design medical gases networks inside and outside the buildings (medical, industrial, LPG, Natural, compressed air, etc.).
• Coordinating with various Ministry and Municipal authorities for relevant approvals in coordination with design team.
• Prepare Bills of quantities, specifications, cost estimation, method of measurement, catalogue cuts as well as support during construction , taking off quantities, detailed priced/un-priced Bills Of quantities, Cost Estimation, etc,.
Projects involved
 Qassim University medical colleges (Project Value SR. 174.886.105).
 Qassim University Hospital (Project Value SR. 500.000.000).
 Saudi Basic Industries Corporations – Sabic (Project Value SR. 1800000)
 American University - AUC New Campus at New Cairo City .
 Riyadh Courts Complex Mosque Extension (Project Value SR. 9.000.000)
 The Royal Commission for Jubail & Yanbu
 Residential Compound in Khobar (Project Value SR. 16.000.000)
 King Faisal University Hospital (Project Value SR. 600,000,000)
 Qassim conference centre (Project Value SR. 242,000000)
 New Cairo – Emaar (Completion/ 2009) (Housing area – town ship, project value estimated L.E. 850,000,000).
February 15, 2004 – july25, 2006
Urban studies and design centre – Egypt (Egypt-Mansoura)
Civil engineer
• Utilities structures (water storage tanks (underground & elevated), sewage lifting and pumping stations, and storm lifting station – storm drainage ponds & culverts).
• Perform design/hydraulic calculations related to wet utilities such as irrigation, storm drainage and subsurface drainage networks using governing engineering formulas, skills, and experience.
• Hydraulic design for waste water treatment plants and water treatment plants.
• Design all the utilities systems (water supply system, sewerage and storm networks, surface drainage system, etc...) and solid waste disposal system.
• Preparing bills of quantities for different projects using international codes and standards ,Preparing payment bills ,conditions of contracts and special specifications for projects according to specific requirements.
August 25, 2003 – February 14, 2004
EL SHIMAA COMPANY – CAIRO
Supervision Civil Engineer
• Supervision on construction some of residential buildings.
Education and Certification
• Bachelor’s Degree in Civil Engineering – Very Good with Honour / Ranked (sixth) / percentage (80.77%).
Egypt - Mansoura University.
• Primary Master's Degree in Sanitary Engineering – Excellent.
Egypt - Mansoura University.
Computer Skills
Experience in civil programs
• AutoCAD up to 2015 - Watercad – SewerGEM – Stormcad – Epanet - Microdrainage
Experience in computer programs
• Word - Excel - Power point - Outlook
Awards and membership of professional bodies
Egyptian syndicate of engineering –member from 2003
Saudi council of engineering –member from 2010 with registration No.90998
Qatar Ministry of Municipality & Urban Planning (MMUP) member up to 2017
PMP preparation course

View Ahmed’s full profile. It's free!

1 million+ other people are on Universalhunt. Search and connect with the potential people across countries. Invite them to your network, send messages and share opportunities.


View Ahmed’s full profile

Contact Details

Send connection reqest to view contact details of Ahmed Farag Mohamed Saber.

People You May Know

Neha Mangla Marpakwar

Head of Production - Conferences at UBM India Pvt Ltd

ASHISH ANAND

Deputy Manager at M/S 4 Colors

Ankur Gangwar

Relationship Manager (Corporate Banking Group) at IDBI Bank

Chintankumar Patel

student at null

Eswararao Maddi

Pipe foruman at Texcell
View All