Profile
Diploma Mechanical Engineer with 5+ Years Total Experience in Thermal Power plant Construction field.
And, I have 2 experience as a Site Engineer For Cooling water pipeline Erection (Pipe Dia up to 2.3m thick 14mm), Condenser Connection Pipeline,Cooling Tower Riser Connection Pipe Erection and Pump house water supply Pipe connection Erection.
And, I have 3 month Experience as a Site engineer in CST Tank Erection and Leak Testing.
And I have 1 year Experience as Site Engineer in Coal Bunker Fabrication and Painting of Coal bunker (Diameter of Bunker 9m).
And I have 2.3 years Experience as a Site in charge in Chimney Flue can Fabrication with Titanium Cladded Plate (Diameter of Can 7.3m) at Coal base Power.
And I have 6 Month experience as a site in charge in Chimney Structure Fabrication at 600MW Coal based power plant.